# Maryland plug-in solar notification checklist PlugWatts preparation worksheet · September 15, 2026 · Companion to https://plugwatts.com/maryland/utility-notification/. Copy this worksheet into a private document. It is not an official utility form, certification, or submission service. Use your utility's current instructions. Do not send this completed worksheet through PlugWatts' public corrections form. ## 1. Identify the route - [ ] I identified the delivery utility on my bill. - [ ] I opened its official instructions and recorded the date below. - [ ] I checked whether the portable-solar pathway fits my proposed system using the [Maryland guide](https://plugwatts.com/maryland/plug-in-solar/). Utility: __________ Official URL: __________ Date checked: __________ Submission channel / destination: __________ ## 2. Prepare the utility's requested information These are preparation prompts; required fields depend on the actual utility form. - [ ] Account-holder and service details match my bill. - [ ] Contact information is correct. - [ ] Manufacturer, exact model, and proposed configuration are recorded. - [ ] Requested capacity ratings come from equipment documents, with AC/DC and units distinguished. - [ ] Certification evidence matches the proposed system; unresolved claims are not marked yes. - [ ] I completed the official form and any signature or existing-generation fields it requests. - [ ] I resolved how to deliver the required safety/capacity certification. AC rating and source document: __________ DC rating and source document: __________ Certification document / model match: __________ Questions still open: __________ ## 3. Review and retain the packet - [ ] I reviewed every field and the destination before sending. - [ ] I saved the exact form and documents to be sent. - [ ] I followed the utility's notification instructions before installation. - [ ] I saved the sent message or portal confirmation and checked for failure messages. | Item | Private filename or record location | |---|---| | Completed official form, if applicable | __________ | | Safety/capacity certification evidence | __________ | | Other requested documents | __________ | | Sent message or portal confirmation | __________ | | Utility acknowledgment or reference, if received | __________ | ## 4. Record the actual result Current status — select only what the evidence supports: - [ ] Prepared: reviewed documents, not yet sent. - [ ] Sent: retained evidence of sending; acknowledgment may be absent. - [ ] Delivery failed: bounce or submission error needs resolution. - [ ] Acknowledged: utility confirmed receipt; keep the message/reference. Date/time sent: __________ Channel: __________ Failure / follow-up requested: __________ Acknowledgment date and reference, if any: __________ Next action: __________ A receipt does not establish equipment or installation safety. Keep property, mounting, electrical, and meter questions separate. Ask the utility how your meter treats exports; do not assume notification creates export credits. [Maryland PSC guidance](https://psc.maryland.gov/regulated-utilities/electricity/renewable-energy/balcony-solar/).